Articles:
This would allow us to build the new refinery while keeping the old one going for as long as possible, before transferring operations to the new one.. As you can imagine, a refinery is a hugely technical building and the M&E element is the most significant part of the project.
We create solutions and give them to clients – for them to use.That means our product has to work independently of us – it has to achieve a level of external usability and stability..

Working in this way has also given us a lot of scope in terms of choosing what sort of team we want to be, to evolve sometimes according to the individuals who join the team, and to decide our own overall development path – but we’ve always been tethered strongly to the core intellectual drive of the company.. What is your position on AI/generative design/automation in construction/robotics in construction?.AI relies on large data sets.These aren’t typically available in our sector so the use of AI in construction has been somewhat limited by that.

Examples of AI are often narrowly defined and only really touch a very specific part of the overall process; the part for which large data sets do exist.. ‘Generative design’ means many things, but generally it’s an approach used in the industry to solve complicated problems; you use generative design to create loads of possible solutions or scenarios, from which you choose the best..The Design for Manufacture and Assembly (DfMA) approach that we have in Bryden Wood – which is embedded in Creative Technologies – means that something like generative design can be more powerful, as it can be built around design rules and content that’s inherently more clearly defined..

When people in the industry talk about cutting-edge construction technologies, these are usually buzzwords about things that are not widely in use, generally misunderstood and unlikely ever to deliver the advertised benefits – because they’re not appropriate solutions and our industry is too far from ready.
It’s good that people talk about construction tech – that creates an environment broadly open to tech – but that’s not the same as being able to actually use it..In an exponentially growing and highly competitive industry, it is not normal for a diverse group from across the industry to come together and share problems and ideas..
But this is exactly the group that convened at Accelerate Data Centres, London, in January 2025..The density debate.
The conversation started by discussing the trends in data centre density..Driven by the relentless development of CPU and GPU processing power, the need for ever greater power and cooling density at rack level continues to increase exponentially.